Wednesday, August 26, 2026
LIVE
Rwanda's REG could lose coach Mugisha to Asian clubs///University of Liberia students march for the reopening of campus///Kenya initiative targets election-related risks to business before 2027///Malawi's National Bank faces scrutiny over a decade of public-money cases///South African startup breeds local hemp seed for a textile industry///Urban foraging grows in South African cities and calls for planning///Museveni's son says he will run for Uganda's presidency in 2031///Presidency blames contractor for Benin-Agbor-Asaba road failure///Liberia's economic growth accelerates to 5.1 per cent///German embassy warns Nigerians it does not work with visa agents///Ugandan villages still contest land titles as oil development advances///Nigerian Troops Repel Bandit Attack on Kebbi Workers///Rwanda's REG could lose coach Mugisha to Asian clubs///University of Liberia students march for the reopening of campus///Kenya initiative targets election-related risks to business before 2027///Malawi's National Bank faces scrutiny over a decade of public-money cases///South African startup breeds local hemp seed for a textile industry///Urban foraging grows in South African cities and calls for planning///Museveni's son says he will run for Uganda's presidency in 2031///Presidency blames contractor for Benin-Agbor-Asaba road failure///Liberia's economic growth accelerates to 5.1 per cent///German embassy warns Nigerians it does not work with visa agents///Ugandan villages still contest land titles as oil development advances///Nigerian Troops Repel Bandit Attack on Kebbi Workers///
Subscribe
Africa
Independent · Digital
The African Herald
Advertisement
PoliticsAI-assisted

Presidency blames contractor for Benin-Agbor-Asaba road failure

Nigeria's Presidency has demanded immediate action on a route central to south-south and south-east traffic.

Broken sidewalk with rubble, caution tape, and traffic cone in urban construction site.
Broken sidewalk with rubble, caution tape, and traffic cone in urban construction site. Photo by Aiden Tieulie on Pexels

Nigeria's Presidency has attributed the recent failure of the Benin-Agbor-Asaba road to the contractor, calling for immediate remedial action.

The route is among the most heavily used in southern Nigeria, carrying traffic between the south-south and south-east regions, including a large share of freight. A failure on this corridor does not simply inconvenience motorists: it lengthens journey times for goods moving inland from the ports and raises delivered costs across a wide catchment.

Assigning responsibility to the contractor is significant for what follows procedurally. If a road fails within its defect liability period, the contractor is ordinarily obliged to carry out remedial work at its own cost, which shifts the fiscal burden away from the public purse. That determination depends on when the section was handed over and on the terms of the contract.

Nigeria's Presidency has attributed the recent failure of the Benin-Agbor-Asaba road to the contractor, calling for immediate remedial action.
Daniel Okonkwo · The African Herald

The recurring engineering question on this corridor is drainage. Roads in high-rainfall zones fail primarily where water is not carried away from the pavement structure, and premature failure is more often traceable to inadequate drainage design or construction than to the surface layer itself.

The episode also returns attention to supervision. Where a client organisation lacks capacity to verify workmanship during construction, defects surface only after handover, at which point remedy becomes a contractual dispute rather than a site instruction.

Advertisement

Based on reporting by Punch Nigeria.

AI transparency. This article was produced with the assistance of artificial intelligence and published under human editorial oversight. AI systems can make mistakes. Read how we use AI (EU AI Act, Art. 50).
Related Stories